Complete Planning-to-Testing Support: TIGER KJ Upgrades Korea’s Central Material Conveying System
- 2025.12.08
Flying Tiger
We're off to Korea for another installation this time!
To help our client build a more stable and efficient production line, our team headed to Korea and complete a full central material conveying system. From planning, equipment positioning, piping connections to system testing, everything went well till the end.

This project covered:
- Full-plant material conveying system integration.
- Main unit and auxiliary equipment installation.
- Piping layout, testing and calibration.
- On-site operation training and workflow optimization.

With precise system design, we helped the client achieve:
- A more automated production process.
- Stable and consist material supply.
- Improved equipment performance.
- Smoother overall factory management.


Every overseas installation is a new challenge - and also a rewarding moment seeing our client's factory become more optimized each time.
We will continue delivering reliable quality and more professional expertise to be the partner you're willing to rely on. Helping high production competitiveness together.
Article Update: 2025.12.08
Back





